Electrical work for chemical factory including design, assembly, installation, testing and commissioning of entire electrical and control work including the below:
- Main redundant PLC control and monitoring panel including all I/O’s required for the system.
- Operator monitoring and control SCADA stations.
- Acid tanks level monitoring and pumping control.
- Fresh water tanks level monitoring and pumping control.
- All instruments such as: level transmitters, level switches, flow meters and pressure transmitters.
- Soft starter Pumps monitoring and operation control.
- VFD Pumps monitoring and operation control.
- Mixer level monitoring and feeding flow control operation.
- Control valves and ON/OFF valves control and monitoring.
- Soft starter and VFD control panels.
- MCC panel for all the machineries of the project.
- Fire alarm and GAS monitoring system for the entire factory.