Supply, program, installation, testing and commissioning of Operation Data Recorder system at APC company, as the below:
- Program, installation, testing and commissioning of main computer screen.
- Program, installation, testing and commissioning of main PLC control panel.
- Cable pulling, termination and interface the system with the main existing PLC S7-400.
- Cable pulling, termination and interface the system with the main engine CAT 3516.
- Data logging and archive system for data and alarms on the system.